Access Roads for Modular Homes: Will the Truck Make It?
blog.back_to_blog
LogistikaMontážPlánováníTransport

Access Roads for Modular Homes: Will the Truck Make It?

March 15, 2026 Domivka.cz

Logistics is a critical part of any modular project. Learn about the requirements for road width, turn radii, and ground stability to ensure your Domivka unit arrives safely in 2026.

The Last Mile Challenge

In 2026, delivering a modular home is a feat of engineering. Domivka manages the logistics from factory to foundation, but success depends on the condition of the 'last mile'. We work with heavy-duty trailers that need more than just a typical driveway.

  • Width Clearances: Minimum 4.5m required for oversized units.
  • Vertical Obstructions: Clearing trees and power lines up to 4.5m height.
  • Turning Circles: Analyzing tight corners for long trailer maneuverability.
  • Soil Stability: Ensuring the road can support 30+ tons of equipment.

Summary

A smooth delivery is all about preparation. Contact Domivka's logistics team for a preliminary route analysis to your property.