Legal Aspects & Permits

How to Legally Place a House
in the Czech Republic without stress

Provedeme vás džunglí paragrafů a zajistíme, aby váš domov stál na pevných a legálních základech.

Biggest Myths vs. Reality

The most common misconception is that a modular home on wheels or pads needs no permit. This is a dangerous myth that could lead to fines.

Under the new Construction Act (effective 7/2024), any house fulfilling the function of a building is treated as a building, regardless of its foundation. The key is whether it serves for living or recreation.

Common Concerns & Solutions

Will neighbors complain about the look?

Our houses are modern architecture. Clean lines and natural materials usually inspire neighbors rather than annoy them.

Can I have permanent residency in the house?

Yes! Our modules meet all technical standards for permanent living. You will receive a house number after final approval.

How long does the paperwork take?

Thanks to our experience and standardized projects, we reduce the process to a minimum. We do most of the work for you.

What We Do for You

Analysis of the zoning plan for your land
Complete project documentation for authorities
Handling the building permit (engineering)
Utility connection project
Kolaudace (final approval) for permanent residence
Vše zařídíme za vás

Don't Risk Illegal Construction

Building authorities are very strict today. Retroactive local permits are expensive and uncertain. We will help you take a path that is 100% legal.

Permit Guide

Free download of our 20-page manual explaining everything from zoning consent to final approval.

Your data is safe with us. By submitting, you agree to personal data processing.

Certified QualityEU Standard10Y Warranty
FAQ

Frequently Asked Questions

Can't find the answer? Contact us.

The house (especially for living) requires connection to electricity, water, and sewage (or septic tank/WWTP). Connection is fast as the house has all outlets ready.
We manufacture our standard houses in our plant exactly according to the chosen type within 4 months of binding order. We then prepare the modules for safe transport to you, where we place them on the prepared foundation within one day. Then we connect the modules inside and out, connect to utilities, clean up after assembly, and hand over your new home.
Under the new building law effective July 1, 2024, a building permit (or 'permit for intent') is always required for a building intended for 'living'. But no worries, our experienced architects and designers will guide you through the process and provide all necessary documents.
Standard houses have pre-defined execution standards. If they don't suit you, let us know. If technically possible, we will meet your needs. The price includes the complete structure, insulation, windows, doors, internal distributions, and basic bathroom equipment.
We use PIR panels (8cm walls, 15cm roof) which insulate like a 60cm brick wall. Comfortable from -25°C to +40°C. The 'Thermos effect' saves energy costs.
Thanks to the Welser steel frame construction and quality materials, the lifespan is comparable to a brick building, i.e., 50-80 years with normal maintenance.